Free Expression, High Productivity
Two plants producing several models, with an output rate up to 62 jobs per hour. These were the input requirements of one of our automotive customers in two of their plants in the LATAM region.
O.L.C.I.’s process solution “Free Expression” allowed the production of left and right doors in the same line, with handling robots on one side and welding robots on the other side of the line, resulting in a total saturation of their cycle time without any time loss, except for 5 seconds rotation time of the turntable with the geometry jigs.
Thanks to this process solution, our Customer lowered the robots quantity by 30%, thus considerably reducing the total investment, with a production output of 124 doors (62 left and 62 right doors) every 60 minutes.